Skip to main content

Ausgold Pre-Feasibility Study

Mid-Tier Gold Mine with outstanding growth potential

Life of
Mine

11 years

Ore
Reserve

32Mt @ 1.25g/t
gold for
1.28Moz

Mineral
Resources

56Mt @ 1.21g/t
gold for
2.16Moz

Plant
Capacity

3.0Mtpa

First 6 years’
Production

126,000oz p.a.

Metallurgical
Recovery

90%

EBITDA
(LOM)

A$981M

NPV5
(post-tax)

A$346M

Capital
Cost

A$225M

IRR
(post-tax)

40.7%

Operating
Cost (AISC)

A$1,370/oz
first 6 years

PaybackPeriod

1.7 years